Monday, January 23, 2017

Happy New Year 2017

Happy New Year 2017. 

Great Ketch has is on the hard and been getting much attention; all in the winter project category. These projects are separated into three main areas.

1) Cockpit Refresh: bodywork to fill dents, gauges, scratches, and voids, and sanding as part of preparation for a new spray gel coat finish – to be sprayed during the warmer months of spring. This project requires the most hours of labor. There is much sanding to be done, shaping, and prep work before any gel coat is applied. One can see the amount of voids the cockpit possessed. I suspect that these cat ketches were not vacuumed cured. Helm steering binnacle will be cleaned and painted where appropriate. 

2) Stanchions: two new stanchions were fabricated so that I can fix a gate on starboard and port side of Great Ketch; old stanchions will be refreshed. New lifelines and appropriate hardware.

3) Miscellaneous: these projects include, hot water removal clean and refixed, new thermostat and new hoses. cockpit locker bilge area to be cleaned and repainted, cockpit locker lids reinforced with fiberglass/epoxy and new vents for waste tank and propane locker, new shorepower electrical wire inside boat, replacement of 30amp shorepower plug with SmartPlug, and electrical work. Varnish work on cabinet door and cabin sole bilge panel.

Three areas of project work is plenty when one considers the amount of work required for any one specific task; therefore, my future blogs will address the different projects and progress made. This blog entry is to provide readers with advanced notice of the content to expect within the next few weeks. These projects will each be assigned their own blog posting. 


Although not a movie trailer, the pictures below represent part of the three project areas that are worked interchangeably and intermittently during the winter months.